What are the categories of initial information? (10)
AIA E203
BIM & Digital Data Exhibit. Protocols for use & transmission of digital data.
AIA G202
Project BIM Protocol Form.
Insurances to be provided by the architect
When does architect provide a certificate of insurance
Upon owner request
In regard to collection of bids, what must the architect assist the owner in? (4)
What do the Bidding Documents consist of?
Bidding requirements & the Contract Documents
In regard to distribution of bidding documents, what must the architect assist the owner with? (4)
Is the review of substitutions considered and additional service?
Yes, and so is supplying addenda that reflect the substitution
What do Proposal Documents consist of?
Proposal Requirements and Proposed Contract Documents
What are the two processes in which a contractor can be selected?
Competitive Bid or Negotiated Proposal
What defines the duration of the architect’s construction phase services?
Begins with award of contract for construction and terminates with the final certificate for payment
What should submittals be reviewed for?
Conformance with the information given and the design concept expressed in the contract documents
What documents shall the owner forward to the owner from the contractor when nearing project completion?
Post Occupancy Evaluation
A required meeting between owner and architect after substantial completion to review the facility operations and performance. This is an included service
What must the owner provide to the architect early on in the project?
Site surveys, geotechnical surveys, tests, inspections, and reports.
What elements are excluded from the cost of the Work? (4 examples)
How long after the submission of contract documents must the owner’s budget for Cost of Work be revised, if procurement has not yet commenced?
90 days