When does tank failure due to brittle fracture ? (4)
How to reduce the risk of BF? (2)
When is assessment should be made for BF?
2. change product to one with greater SG
What are some consideration if the tank is not per latest API 650 and will be change to a more severe service? (6)
Lastly if all consideration is not met, what can be done?
Rerate tank based on prior operating history, (restrict fill height, min metal temp or both)
What can be done to establish inspection frequencies?
On stream, NDE methods
Frequency of routine inservice inspections?
not exceed ONE month
frequency of external inspection and by whom?
LESS (5 years or RCA/4N) , AI
frequency of UT (when CR is known and not ) and by whom?
2. Known = LESS (RCA/2N )
When can a UT be subsittued?
During an internal inspection
What can supplement on tream UT?
Electromagnetic methods
fiberglass-reinforce lining added how many years?
5 years
internal thin film coating how many years added?
2 years
RPB adds how many years
10 years
Cathodic protection adds how many years
5 years
bottom corrosion allowance > 0.150” add how many years
=CA-150 miles / CR
SS construction adds how man years
10years
Without RPB what is max years for inspection?
20 years
with RPB what is max years for inspection?
30 years
With RBI what is max years ?
no max
max subsequent internal inspection interval with and w/o RPB?
20 years w/o and 30 years w/
When is an external inspection in lieu of an internal inspection allowed ?
where construction, size, or other aspects allow external access to the tank bottom to determine bottom thickness
What does API Annex C contain?
sample checklist of items for consideration when doing inspections.
What does a complete record file consist of? (3)