LEED categorizes projects under ____ according to their types of construction & space usage.
Rating systems
What is the first requirement a project persuing a LEED certification should look into?
Minimum program requirements (MPR)
What are the Minimum Program Requirements (MPR) for a LEED certification?
What does a project have to get after fulfilling the MPR?
Prerequities for the selected rating system
What is the next step after achieving MPR & prerequisites for the selected LEED rating system?
Collect points w/in rating system
What is the minimum # of points required for a LEED certification?
40/100
What is the max # of points you can get for a LEED certificate, and what happens if you go over?
100;
Bonus points - 10 max bonus points for total 110
Satisfying prerequisites does not result in the award of any points, only ____ do.
Credits
What do you need to do once the chosen credits are achieved for the project?
Prepare documentation to show achieved MPRs, pre reqs, & enough credits. Upload to LEED online
____ & ___ are manadtory for a project to earn a LEED certificate. However, projects are free to choose the credits they want to persue.
MPRs & pre reqs
How many points are needed to achieve LEED Certified (base certificate)?
40-49
How many points are needed to achieve LEED Silver?
50-59
How many points are needed to achieve LEED Gold?
60-79
How many points are needed to achieve LEED Platinum?
80+
What happens if a project earns 90 credits but misses 1 pre req?
No LEED certificate rewarded
What are the 5 LEED categories for rating systems?
What are the 3 Interior Design & Construction (ID+C) rating systems?
What kind of buildings are in the 6 Building Operations & Maintenance (O+M) rating systems?
What are the 7 Building Design & Construction (BD+C) rating system types? (Types of buildings)
What are the 2 Neighborhood Development (ND) rating systems?
- build project
What are the 2 Homes rating systems?
- Multi family mid rise
Can a project have multiple rating systems?
No
If more than one rating system seems applicable to a project, what rule should be used to decide the rating system?
40/60
How do you apply the 40/60 rule?