ICC-ES
A nonprofit, limited liability company that evaluations buildings products, components, methods, and materials
Proposed Condition must consider the following analysis:
Allowed per Code must consider the following analysis:
Code Section or Table
Factors required for designers to determine how code is applied for the project is given from:
program, site or zoning
-Occupancy Classification - the client determines what functions they want;
Location of building on building footprint, zoning, natural features, etc.
Building height and area- given the scope of the project, the designer will note how large the building needs to be and how many floors will be required.
With the information of site or zoning constraint, you can determine:
The maximum allowable area of a building is limited by a combination of
Floor area ratio and construction type
What facts determine the total allowable area and height of a building
construction type
occupancy group
adjacency of buildings
whether or not the building has a sprinkler system
Primary reason for Fire resistance requirements in IBC
Is to permit safe egress in the state of occupants in case of fire.
People’s safety comes above material safety, although structure integrity is another valid reason.
A critical factor in determining the size of a build
Existing in the occupant load of the building
How is occupant load calculated?
Occupant load is specified in the building code
What factors determine the total height of a building
User Group
type of construction
zoning ordinances
fire-suppression system