What is full planning permission?
Full planning applications can be made when all the details are known and the development is already considered viable.
What is on the deliverables list for full planning permission?
Site area
Current and past use of the development site
Flood risk assessment
Access report
The materials which are to be used
Information concerning waste storage and collection
Foul sewage report
Employment and hours of opening
Past and proposed industrial uses
For large housing developments this may be an Affordable housing statement, Environmental statement or Site waste management statement.
How long does it take to determine a full planning application
A decision on an application should be made within 8 weeks. This begins when the Local Planning Authority accepts the application as valid. On major developments this may take 13 weeks
What is outline planning permission?
Outline planning applications are used to gain an understanding as to whether the nature of a development is acceptable, this can help ensure viability up front. Specific details known as ‘reserved matters’ can then be confirmed later.
What are reserved matters?
Landscaping - the improvement or protection of the amenities of the site and the area and the surrounding area, this could include planting trees or hedges as a screen
Appearance - aspects of a building or place which affect the way it looks, including the exterior of the development
Layout - includes buildings, routes and open spaces within the development and the way they are laid out in relations to buildings and spaces outside the development
Access - covers accessibility for all routes to and within the site, as well as the way they link up to other roads and pathways outside the site
Scale - includes information on the size of the development, including the height, width and length of each proposed building
What is the cost of outline planning permission
An application for outline planning permission will cost £462 per 0.1 hectares for sites of up to 2.5 hectares.
Any site exceeding 2.5 hectares will cost up to £150,000.
How long does it take to determine an outline application
Outline planning permission should be granted within 8 weeks. This begins when the Local Planning Authority validate the application. For larger developments this may take up to 13 weeks.
Can you begin development with outline planning consent?
No - outline planning permission does not act as consent for development to begin.
How long do you have to submit reserved matters?
Once outline planning permission has been granted, a ’reserved matters’ application must be made within three years of the consent
How long do you have to begin works on an outline consent?
Development must commence within two years from the latest reserved matters approval.
What is the cost of reserved matters applications?
A cost is applied of £462 per house, up to 50 houses.
Total cost cannot exceed £300,000
What is listed building consent
Planning (Listed Building and Conservation Areas) Act 1990
An application for listed building consent should be submitted for all applications requiring alteration, extension, or demolition to a listed building.
What are the types of listing?
Listed buildings are classified into grades as follows:
How much is the cost of a listed building consent
There is no fee
How long does it take for LBC to be consented
Listed building consent should be granted within 8 weeks. This begins when the Local Planning Authority validates the application. This includes a 21-day consultation period where neighbours and interested parties can comment on the proposal.
What should be included in a Listed Building Application
site plan, location plan, design and access statement and heritage assessment
What is a Lawful Development Certificate
An application to establish whether
What are the time limits for LDC?
The time limits are:
Once these time limits have passed, the development becomes lawful, in terms of planning.
What are the costs of LDC applications?
What evidence must be submitted for a LDC?
How long are the timescales for achieving a LDC?
Should be decided within 8 weeks. This starts once the application has been validated by the Local Planning Authority.
What happens if the lawful development certificate is refused?
Need to apply for full planning permission
What is Prior Approval?
Prior approval is where you submit all details necessary for the Local Authority to determine a PD proposal complies with permitted development legislation, and if its prior approval will be required and/or should be granted
What is Permitted Development
Certain types of development are granted planning permission by national legislation without the need to submit a planning application.