A. Proposal Supplements
B. Instructions to Bidders
C. Noncollusive Affidavit
D. Pre-qualification Forms
D. Pre-qualification Forms
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
A. General Conditions
A. Order of Precedence
B. Incorporated by Reference
C. Standardized General Conditions
D. Shop Drawings and Reference Standards
B. Incorporated by Reference
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
A. General Conditions
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
C. Instructions to Bidders
A. Addenda
B. Change Directive
C. Proposal Supplements
D. Contract Change Order
A. Addenda
A. Plans
B. Shop Drawings
C. Product Data Sheets
D. Schematics Drawings
A. Plans
A. Proposal Supplements
B. Instructions to Bidders
C. Noncollusive Affidavit
D. Owner/Contractor Agreement
C. Noncollusive Affidavit
A. Agreement
B. General Requirements
C. Technical Specifications
D. Supplementary Conditions
C. Technical Specifications
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
B. General Requirements
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
D. Supplementary Conditions
A. Proposal Supplements
B. Instructions to Bidders
C. Noncollusive Affidavit
D. Pre-qualification Forms
A. Proposal Supplements
A. General Requirements
B. Instructions to Bidders
C. Proposal Supplements
D. Prevailing Wage Rate Schedule
D. Prevailing Wage Rate Schedule
A. Union projects
B. Merit Shop Projects
C. Privately Funded Projects
D. Federally Funded Projects
D. Federally Funded Projects
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
B. General Requirements
A. Plug
B. Alternate
C. Contingency
D. Cash Allowance
D. Cash Allowance
A. General Requirements
B. Technical Specifications
C. Supplementary Conditions
D. Information Available to Bidders
D. Information Available to Bidders
A. General Requirements
B. Technical Specifications
C. Supplementary Conditions
D. Information Available to Bidders
A. General Requirements
A. General Requirements
B. Technical Specifications
C. Supplementary Conditions
D. Information Available to Bidders
A. General Requirements
A. Proposal Form, Bid Breakdown, Addendum, Bid Bond & Noncollusive Affidavit
B. Proposal Supplements, Performance Bond, Payment Bond & Insurance Certificate
C. Prequalification Forms, Alternates, Cash Allowances, Prevailing Wages, Deposit
D. Agreement, Regulatory Requirements, Shop Drawings, Product Data & Samples
A. Proposal Form, Bid Breakdown, Addendum, Bid Bond & Noncollusive Affidavit
A. Placed in the footing horizontally
B. Placed under a load-bearing wall
C. Placed in the vertical concrete joint(s) between pours
D. At the intersection of the concrete wall and the elevated slab
A. Placed in the footing horizontally
A. Attached to the inside face of the formwork to form a texture
B. Placed in the corners of exposed concrete to eliminate sharp edges
C. Placed around the perimeter of an elevated slab to hold the concrete
D. Placed in the exterior corners of the formwork to reinforce the walers
B. Placed in the corners of exposed concrete to eliminate sharp edges
A. The inside plan lengths and widths added together
B. The outside plan length and outside plan width added together
C. The outside plan length and outside plan width multiplied together
D. The height of the wall and the outside perimeter multiplied together
A. The inside plan lengths and widths added together
A. The inside plan lengths and widths added together
B. The outside plan length and outside plan width added together
C. The outside plan length and outside plan width multiplied together
D. The height of the wall and the outside perimeter multiplied together
B. The outside plan length and outside plan width added together