Safety category 1 buildings are designed for earthquake and other design basis events. These buildings are:
Containment, AB, fuel handling building, main steam tunnels, river screen house(portion housing ESW intake), sx cooling towers, deep well enclosure
Unrestricted Area (10CFR20.1003)
Restricted Area (10CFR20.1003)
Exclusion Area (10CFR100.3)
Exclusion area size basis? Dose….
10CFR100.11—An area of such size that an individual located at any point on its boundary for two hours immediately following onset of the postulated fission product release would not receive a total radiation dose to the whole body in excess of 25 rem or a total radiation dose in excess of 300 rem to the thyroid from iodine exposure.
10CFR50.67 (AST)—An individual located at any point on the boundary of the exclusion area for any 2-hour period following the onset of the postulated fission product release, would not receive a radiation dose in excess of 0.25 Sv (25 rem) total effective dose equivalent (TEDE).
Exclusion area distance?
1460 feet from outer containment wall
lpz design
10CFR100.11—A low population zone of such size that an individual located at any point on its outer boundary who is exposed to the radioactive cloud resulting from the postulated fission product release (during the entire period of its passage) would not receive a total radiation dose to the whole body if excess of 25 rem or a total radiation dose in excess of 300 rem to the thyroid from iodine exposure.
10CFR50.67 (AST)—An individual located at any point on the outer boundary of the low population zone, who is exposed to the radioactive cloud resulting from the postulated fission product release (during the entire period of its passage), would not receive a radiation dose in excess of 0.25 Sv (25 rem) total effective dose equivalent (TEDE).
LPZ distance?
3.0 miles from midpoint between two reactors
EPZ distance?
10 mile radius from between two reactors
EPZ ingestion exposure pathway?
50 miles
Makeup sources to MDCT
Normal- CW makeup
Backup/manual- deepwell pumps
Emergency- two diesel driven SX pumps
Control room dose during DBA?
After DBA (LOCA),
CR WB dose
for the duration
of the accident will
not exceed 5 REM
or its equivalent
(This includes ingress
and egress as per the
requirements of
10CFR50, Appendix A)